E-N RAMP over I-90 HIGHLANDS DR
2.1 E JCT SR 900 · County 033, Washington · Built 2003 · 2 Lanes · 8,604 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.531486, -122.025153
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 23 years old.
Nearby Bridges
RAMP over E ISSAQUAH CREEK
Built 2003
HIGHLANDS DR over I-90 E FK ISSAQUAH CR
Built 2003
I-90 over E FK ISSAQUAH CREEK
Built 1976
I-90 over E FK ISSAQUAH CREEK
Built 1976
W-S RAMP I-90 over I-90
Built 1976
HIGHLANDS DR NE over PEDESTRIAN TUNNEL
Built 2003
I-90 over E FK ISSAQUAH CREEK
Built 1976
I-90 RAMP over E FK ISSAQUAH CREEK
Built 1976
E-E RAMP over N-E RAMP FROM FRONT ST
Built 2003
N.E. DOGWOOD ST. over E.FK. ISSAQUAH CK.
Built 1996
Bridge Details
- Structure #
- 0016010D0000000
- Year Built
- 2003
- Length
- 281.9 m (924.9 ft)
- Max Span
- 71 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 8,604
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,007,000
- Total Project Cost
- $18,014,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.