SR 21 over GRANITE CREEK
53.0 N LINCOLN CO · County 019, Washington · Built 2001 · 2 Lanes · 406 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
48.633944, -118.729833
This bridge is in worse condition than 29.1% of bridges in County 019. The average bridge in Washington is 0 years old; this one is 25 years old.
Bridge Details
- Structure #
- 0015809A0000000
- Year Built
- 2001
- Length
- 6.4 m (21 ft)
- Max Span
- 6.4 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 406
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $174,000
- Total Project Cost
- $349,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.