SR 21 over SAN POIL RIVER

2.8 N JCT SR 20 · County 019, Washington · Built 1987 · 2 Lanes · 1,580 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

48.678503, -118.663939

This bridge is in worse condition than 29.1% of bridges in County 019. The average bridge in Washington is 0 years old; this one is 39 years old.

Nearby Bridges

Bridge Details

Structure #
0013285A0000000
Year Built
1987
Length
14.3 m (46.9 ft)
Max Span
13.4 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
1,580
Material
Prestressed Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$380,000
Total Project Cost
$759,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.