US 101 over SALMON CREEK
7.8 S CLALLAM CO · County 031, Washington · Built 1986 · 2 Lanes · 13,724 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
47.988936, -122.889328
This bridge is in worse condition than 24.7% of bridges in County 031. The average bridge in Washington is 0 years old; this one is 40 years old.
Nearby Bridges
SR 20 over SNOW CREEK
Built 1940
US 101 over SNOW CREEK
Built 1986
W UNCAS ROAD over SNOW CREEK
Built 1964
West Uncas Road over Salmon Creek
Built 2018
SR 20 over EAGLEMOUNT HALF BRIDGE
Built 1956
SR 104 EB over US 101
Built 1967
OLD GARDINER ROAD over CONTRACTORS CREEK
Built 2000
NO DATA ENTERED over SNOW CREEK
Built 2010
Snow Creek Road over Andrews Creek
Built 2014
CENTER ROAD over CHIMACUM CREEK
Built 1955
Bridge Details
- Structure #
- 0013073A0000000
- Year Built
- 1986
- Length
- 37.2 m (122 ft)
- Max Span
- 12.2 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 13,724
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,333,000
- Total Project Cost
- $2,666,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.