CENTER ROAD over CHIMACUM CREEK
3.45 JCT FAS9517 · County 031, Washington · Built 1955 · 2 Lanes · 4,080 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.963361, -122.780542
This bridge is in worse condition than 60.8% of bridges in County 031. The average bridge in Washington is 0 years old; this one is 71 years old.
Nearby Bridges
SR 104 over QUILCENE-CHIMAKUM RD
Built 1964
SR 19 over CHIMACUM CREEK
Built 1916
SR 20 over EAGLEMOUNT HALF BRIDGE
Built 1956
BELFRAGE ROAD over LUDLOW CREEK
Built 1977
HUNT ROAD over CHIMACUM CREEK
Built 1971
SR 104 EB over US 101
Built 1967
W UNCAS ROAD over SNOW CREEK
Built 1964
OLD TARBOO ROAD over TARBOO CREEK
Built 2005
SR 20 over SNOW CREEK
Built 1940
US 101 over SNOW CREEK
Built 1986
Bridge Details
- Structure #
- 084649000000000
- Year Built
- 1955
- Reconstructed
- 1980
- Length
- 7.6 m (24.9 ft)
- Max Span
- 6.7 m
- Width
- 13.9 m (45.6 ft)
- Lanes
- 2
- Daily Traffic
- 4,080
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $632,000
- Total Project Cost
- $1,264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.