I-82 over COLUMBIA RIVER

1.0 E JCT SR 14 · County 005, Washington · Built 1988 · 2 Lanes · 12,770 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0012819A0000000
Year Built
1988
Length
1046.4 m (3433.1 ft)
Max Span
201.2 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
12,770
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$32,614,000
Total Project Cost
$65,227,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.