I-82 over RAILROAD
0.6 E JCT SR 14 · County 005, Washington · Built 1980 · 2 Lanes · 12,770 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
45.938931, -119.331781
This bridge is in worse condition than 58.1% of bridges in County 005. The average bridge in Washington is 0 years old; this one is 46 years old.
Nearby Bridges
I-82 over BN RR
Built 1980
I-82 over COLUMBIA RIVER
Built 1988
I-82 over COLUMBIA RIVER
Built 1955
I-82 over SR 14
Built 1981
I-82 over SR 14
Built 1980
I-82 (HWY 070) WB over COLUMBIA RIVER
Built 1988
I-82 (HWY 070) EB over Columbia River
Built 1955
I-82 (HWY 070) EB over THIRD STREET
Built 1985
I-82 (HWY 070) WB over THIRD STREET
Built 1985
I-82 (HWY 070) EB over UPRR
Built 1985
Bridge Details
- Structure #
- 0011608C0000000
- Year Built
- 1980
- Length
- 60.7 m (199.1 ft)
- Max Span
- 24.4 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 12,770
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,890,000
- Total Project Cost
- $3,781,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.