SR 124 over TOUCHET RIVER

6.3 E JCT SR 125 · County 071, Washington · Built 1984 · 2 Lanes · 1,510 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0012540A0000000
Year Built
1984
Length
41.5 m (136.2 ft)
Max Span
39.6 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,510
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,163,000
Total Project Cost
$2,326,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.