MAIN ST over TOUCHET RIVER

N SIDE OF TOWN ON MAIN ST · County 071, Washington · Built 2017 · 2 Lanes · 275 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
088951000000000
Year Built
2017
Length
39.3 m (128.9 ft)
Max Span
38.1 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
275
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,509,000
Total Project Cost
$5,018,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.