SR 525 over MAPLE RD & ASH WAY

0.4 N JCT I-5 · County 061, Washington · Built 1983 · 3 Lanes · 33,261 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
0011980A0000000
Year Built
1983
Length
253 m (830.1 ft)
Max Span
42.4 m
Width
20.6 m (67.6 ft)
Lanes
3
Daily Traffic
33,261
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,433,000
Total Project Cost
$22,866,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.