CLEAR CREEK RD NW over SR 3 ACCESS - LUOTO ROAD
0.3 W SR 3 · County 035, Washington · Built 1981 · 2 Lanes · 3,389 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.701281, -122.692136
This bridge is in worse condition than 25.8% of bridges in County 035. The average bridge in Washington is 0 years old; this one is 45 years old.
Nearby Bridges
N-W RAMP TO LUOTO over SR 3
Built 1981
SR 3 over SR 308 (LUOTO RD)
Built 1981
SR 3 over SR 308 (LUOTO RD)
Built 1981
MOUNTAIN VIEW RD over SR 3
Built 1980
TRIGGER AVE over SR 3
Built 1979
CLEAR CREEK ROAD over TRIGGER AVE
Built 1979
SHERMAN HILL RD over SR 3
Built 1981
WOODBRIDGE ST NW over WETLANDS
Built 2017
SR 303 (WAAGA WAY) over SR 3
Built 1981
SILVERDALE WAY over CLEAR CREEK
Built 2006
Bridge Details
- Structure #
- 0011864B0000000
- Year Built
- 1981
- Length
- 61.9 m (203.1 ft)
- Max Span
- 42.7 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,389
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,736,000
- Total Project Cost
- $3,471,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.