SUNNYSIDE RD over I-82

5.3 E JCT SR 223 · County 077, Washington · Built 1981 · 2 Lanes · 2,357 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0011788I0000000
Year Built
1981
Length
64.6 m (211.9 ft)
Max Span
31.8 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,357
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,114,000
Total Project Cost
$4,229,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.