I-82 over LUTHER ROAD

3.0 E JCT SR 223 · County 077, Washington · Built 1980 · 2 Lanes · 13,575 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0011788F0000000
Year Built
1980
Length
35.1 m (115.2 ft)
Max Span
33.3 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
13,575
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,120,000
Total Project Cost
$2,240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.