I-82 over WINE COUNTRY RD RR PED
3.8 E JCT SR 241 · County 077, Washington · Built 1979 · 3 Lanes · 14,593 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.270392, -119.923594
This bridge is in worse condition than 58.9% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 47 years old.
Nearby Bridges
I-82 over WINE COUNTRY RD RR PED
Built 1979
WILSON ROAD over I-82
Built 1980
ELM ST over I-82
Built 1980
OLMSTEAD ROAD over SVID CANAL
Built 1959
ELM STREET over SVID CANAL
Built 1962
I-82 over TEAR-FORSELL ROAD
Built 1981
I-82 over TEAR-FORSELL ROAD
Built 1981
I-82 over SUNNYSIDE CANAL
Built 1979
I-82 over SUNNYSIDE CANAL
Built 1979
BONNIEVIEW ROAD over SVID CANAL
Built 1969
Bridge Details
- Structure #
- 0011095B0000000
- Year Built
- 1979
- Length
- 123.7 m (405.8 ft)
- Max Span
- 41.5 m
- Width
- 17.1 m (56.1 ft)
- Lanes
- 3
- Daily Traffic
- 14,593
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,786,000
- Total Project Cost
- $11,571,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.