I-82 over SUNNYSIDE CANAL

5.5 E JCT SR 241 · County 077, Washington · Built 1979 · 2 Lanes · 12,881 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0011095F0000000
Year Built
1979
Length
26.5 m (86.9 ft)
Max Span
25 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
12,881
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$826,000
Total Project Cost
$1,653,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.