SR 167 over FIRST AVE N
1.5 N PIERCE CO · County 033, Washington · Built 1977 · 6 Lanes · 48,865 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.279183, -122.258392
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 49 years old.
Nearby Bridges
SR 167 over ELLINGSON ROAD
Built 1977
SR 167 over THIRD AVE SW
Built 1977
15TH ST SW over SR 167
Built 1975
NB RAMP over N-E RAMP
Built 1975
15 SW TO SUPERMALL over 15TH ST SW
Built 1995
SR 167 SB HOV over SR 18
Built 2016
SR 167 NB over SR 18
Built 1973
SR 167 over SR 18
Built 1973
A STREET SE over STUCK RIVER (WHITE RIV)
Built 1991
SR 18 over W VALLEY HWY(OLD SR 181)
Built 1957
Bridge Details
- Structure #
- 0010513C0000000
- Year Built
- 1977
- Reconstructed
- 1987
- Length
- 44.5 m (146 ft)
- Max Span
- 19.5 m
- Width
- 28.7 m (94.2 ft)
- Lanes
- 6
- Daily Traffic
- 48,865
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,225,000
- Total Project Cost
- $6,450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.