SR 167 over THIRD AVE SW

0.5 N PIERCE CO · County 033, Washington · Built 1977 · 4 Lanes · 52,419 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0010513A0000000
Year Built
1977
Reconstructed
1987
Length
50 m (164 ft)
Max Span
20.1 m
Width
26.7 m (87.6 ft)
Lanes
4
Daily Traffic
52,419
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,350,000
Total Project Cost
$6,699,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.