SR 167 over THIRD AVE SW
0.5 N PIERCE CO · County 033, Washington · Built 1977 · 4 Lanes · 52,419 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.265167, -122.261792
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 49 years old.
Nearby Bridges
SR 167 over ELLINGSON ROAD
Built 1977
SR 167 over FIRST AVE N
Built 1977
SR 167 over STEWART RD SE
Built 1977
SR 167 over STEWART ST E
Built 1987
W-N RAMP/STEWART R over SOATON CREEK
Built 1960
STEWART RD E over WHITE RIVER
Built 1952
A STREET SE over STUCK RIVER (WHITE RIV)
Built 1991
SR 167 over SOATON CREEK
Built 2003
LAKE TAPPS PARKWAY over E VALLEY HIGHWAY
Built 2003
24TH ST E over SR 167 SOATON CK
Built 2004
Bridge Details
- Structure #
- 0010513A0000000
- Year Built
- 1977
- Reconstructed
- 1987
- Length
- 50 m (164 ft)
- Max Span
- 20.1 m
- Width
- 26.7 m (87.6 ft)
- Lanes
- 4
- Daily Traffic
- 52,419
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,350,000
- Total Project Cost
- $6,699,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.