SR 203 over TOLT RIVER

5.3 N JCT SR 202 · County 033, Washington · Built 1977 · 2 Lanes · 10,906 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0010370A0000000
Year Built
1977
Length
81.7 m (268 ft)
Max Span
48.8 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
10,906
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,164,000
Total Project Cost
$4,328,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.