SR 203 over DRAINAGE CHANNEL

7.7 N JCT SR 202 · County 033, Washington · Built 1954 · 2 Lanes · 9,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0004656B0000000
Year Built
1954
Reconstructed
1998
Length
18.3 m (60 ft)
Max Span
6.7 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
9,800
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$598,000
Total Project Cost
$1,197,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.