US 12 over BN & UP RR

8.7 E JCT SR 124 · County 071, Washington · Built 1975 · 2 Lanes · 6,038 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

46.106436, -118.915064

This bridge is in worse condition than 43.6% of bridges in County 071. The average bridge in Washington is 0 years old; this one is 51 years old.

Nearby Bridges

Bridge Details

Structure #
0009781A0000000
Year Built
1975
Length
165.8 m (544 ft)
Max Span
37.2 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
6,038
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,556,000
Total Project Cost
$11,111,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.