US 730 over SPRING GULCH

1.4 N OREGON · County 071, Washington · Built 1950 · 2 Lanes · 3,369 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0003272C0000000
Year Built
1950
Length
10.3 m (33.8 ft)
Max Span
9.8 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
3,369
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$304,000
Total Project Cost
$608,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.