SR 510 over NP RY

3.9 E JCT I-5 · County 067, Washington · Built 1970 · 2 Lanes · 13,225 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008628A0000000
Year Built
1970
Length
58.2 m (190.9 ft)
Max Span
21.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
13,225
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,528,000
Total Project Cost
$3,056,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.