MERIDIAN RD over I-5

1.2 N JCT SR 510 · County 067, Washington · Built 1968 · 2 Lanes · 7,124 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008100D0000000
Year Built
1968
Length
85.3 m (279.9 ft)
Max Span
27.1 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
7,124
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,261,000
Total Project Cost
$4,522,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.