I-5 over MCALLISTER CR

2.2 N JCT SR 510 · County 067, Washington · Built 1968 · 1 Lanes · 2,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008100G0000000
Year Built
1968
Length
65.8 m (215.9 ft)
Max Span
11.9 m
Width
8 m (26.2 ft)
Lanes
1
Daily Traffic
2,200
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,436,000
Total Project Cost
$2,873,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.