I-90 S-E RAMP over I-90 MERCER SLOUGH

6.4 E JCT I-5 · County 033, Washington · Built 1970 · 1 Lanes · 8,091 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0008610E0000000
Year Built
1970
Length
588 m (1929.1 ft)
Max Span
46.3 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
8,091
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,744,000
Total Project Cost
$27,488,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.