I-90 over MERCER SLOUGH

6.4 E JCT I-5 · County 033, Washington · Built 1970 · 3 Lanes · 31,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0008610C0000000
Year Built
1970
Reconstructed
1993
Length
525.2 m (1723.1 ft)
Max Span
12.8 m
Width
15.7 m (51.5 ft)
Lanes
3
Daily Traffic
31,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,460,000
Total Project Cost
$40,921,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.