S 25TH ST over SR 16 RAMPS/S SPRAGUE AV
0.4 N JCT I-5 · County 053, Washington · Built 1969 · 2 Lanes · 2,575 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.236606, -122.4632
This bridge is in worse condition than 17.5% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 57 years old.
Nearby Bridges
I-5 S-E RAMP over TERRAIN
Built 2011
SPRAGUE AVE over SR 16
Built 2010
SR 16 W-N RAMP over CENTER ST/STRR
Built 2013
N-E RAMP over CENTER STREET
Built 2011
SR 16 W-S RAMP over CENTER STREET & STRR
Built 2013
SR 16 HOV LANES over CENTER ST / ST RR
Built 2013
SR 16 S TO SPRAGUE over TERRAIN
Built 2010
SR 16 HOV LANES over S TACOMA WAY
Built 2018
SR 16 over S TACOMA WAY/STRR/CENTER
Built 2013
SR 16 over S TACOMA WAY/STRR/CENTER
Built 2011
Bridge Details
- Structure #
- 0008543C0000000
- Year Built
- 1969
- Length
- 45.7 m (149.9 ft)
- Max Span
- 30.2 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 2,575
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,069,000
- Total Project Cost
- $2,138,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.