195TH ST over I-405

0.8 N JCT SR 522 · County 033, Washington · Built 1968 · 5 Lanes · 19,064 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0008286A0000000
Year Built
1968
Reconstructed
1998
Length
76.8 m (252 ft)
Max Span
23.5 m
Width
23.7 m (77.8 ft)
Lanes
5
Daily Traffic
19,064
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,190,000
Total Project Cost
$8,379,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.