CENTRAL WAY over NP RY
3.3 N JCT SR 520 · County 033, Washington · Built 1965 · 4 Lanes · 24,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
47.679356, -122.190144
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 61 years old.
Nearby Bridges
I-405 over NE 85TH ST
Built 1971
I-405 over NE 85TH ST
Built 1971
NE 72ND PLACE over I-405
Built 1970
NE 116TH ST over RAILROAD
Built 2012
I-405 over NE 116TH ST
Built 2006
OLD REDMOND ROAD over 138th AVE NE
Built 1970
I-405 over NE 116TH ST
Built 2007
I-405 over PEDESTRIAN TRAIL
Built 1956
I-405 over PEDESTRIAN TRAIL
Built 1970
NE 124TH ST over RAMP/120TH AVE
Built 1990
Bridge Details
- Structure #
- 0007548A0000000
- Year Built
- 1965
- Length
- 45.4 m (149 ft)
- Max Span
- 16.2 m
- Width
- 16.8 m (55.1 ft)
- Lanes
- 4
- Daily Traffic
- 24,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,682,000
- Total Project Cost
- $9,365,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.