I-90 over LOWER PEOH PT RD & TRAIL
0.8 E JCT SR 970 · County 037, Washington · Built 1965 · 2 Lanes · 14,717 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.174947, -120.890792
This bridge is in worse condition than 89.1% of bridges in County 037. The average bridge in Washington is 0 years old; this one is 61 years old.
Nearby Bridges
I-90 over LOWER PEOH PT RD & TRAIL
Built 1965
I-90 over YAKIMA RIVER
Built 1965
I-90 over YAKIMA RIVER
Built 1965
SR 970 over I-90 E CLE ELUM
Built 1966
MARKOVICH ROAD over HILINE CANAL
Built 1999
U PEOH POINT ROAD over HILINE CANAL
Built 1991
U PEOH POINT ROAD over HILINE CANAL
Built 1991
U PEOH POINT ROAD over HILINE CANAL
Built 1992
U PEOH POINT ROAD over HILINE CANAL
Built 1988
OAKES AVE over I-90
Built 1965
Bridge Details
- Structure #
- 0007543B0000000
- Year Built
- 1965
- Length
- 114.3 m (375 ft)
- Max Span
- 30.2 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 14,717
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,562,000
- Total Project Cost
- $7,125,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.