OAKES AVE over I-90
29.5 E JCT SR 906 · County 037, Washington · Built 1965 · 2 Lanes · 895 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.191267, -120.936119
This bridge is in worse condition than 44.4% of bridges in County 037. The average bridge in Washington is 0 years old; this one is 61 years old.
Nearby Bridges
SR 970 over NP RY
Built 1966
SOUTH CLE ELUM RD over YAKIMA RIVER
Built 1965
I-90 over S CLE ELUM RD & BNSF RR
Built 1966
I-90 over S CLE ELUM RD & BNSF RR
Built 1966
E-N RAMP over I-90
Built 1965
SR 970 over I-90 E CLE ELUM
Built 1966
MOHAR ROAD over HILINE CANAL
Built 1976
U PEOH POINT ROAD over HILINE CANAL
Built 1988
U PEOH POINT ROAD over HILINE CANAL
Built 1992
I-90 over YAKIMA RIVER
Built 1965
Bridge Details
- Structure #
- 0007582A0000000
- Year Built
- 1965
- Length
- 68.6 m (225.1 ft)
- Max Span
- 22.9 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 895
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,496,000
- Total Project Cost
- $2,992,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.