SR 522 over W-S RAMP I-5
0.1 E JCT I-5 · County 033, Washington · Built 1962 · 1 Lanes · 14,052 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.683083, -122.316961
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 64 years old.
Nearby Bridges
8TH AVE N TO I-5 N over I-5 N RAMP TO SR 522 E
Built 1963
I-5 EXP RAMP over I-5 NB I-5 EXPRESS RAMP
Built 1962
5TH AVE NE over I-5 I-5 EXPRESS LANES
Built 1964
NE 70TH-NE 71ST ST over I-5
Built 1962
I-5 SB over FALLOUT SHELTER
Built 1963
NE 80TH ST over I-5 I-5 EXP LNS RAMPS
Built 1964
N 85TH TO SB I-5 over I-5 SB RAMP TO NE 80TH
Built 1964
I-5 over RAVENNA BLVD
Built 1961
I-5 REV EXP LANES over RAVENNA BLVD
Built 1961
I-5 over RAVENNA BLVD
Built 1961
Bridge Details
- Structure #
- 0006911D0000000
- Year Built
- 1962
- Length
- 109.1 m (357.9 ft)
- Max Span
- 28.3 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 1
- Daily Traffic
- 14,052
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,210,000
- Total Project Cost
- $4,421,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.