I-5 REV EXP LANES over RAVENNA BLVD
5.8 N JCT I-90 · County 033, Washington · Built 1961 · 3 Lanes · 36,725 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.674611, -122.320683
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 65 years old.
Nearby Bridges
I-5 over RAVENNA BLVD
Built 1961
I-5 over RAVENNA BLVD
Built 1961
I-5 SB over FALLOUT SHELTER
Built 1963
NE 70TH-NE 71ST ST over I-5
Built 1962
8TH AVE N TO I-5 N over I-5 N RAMP TO SR 522 E
Built 1963
15th Ave NE over COWEN PARK RAVINE
Built 1936
SR 522 over W-S RAMP I-5
Built 1962
I-5 EXP RAMP over I-5 NB I-5 EXPRESS RAMP
Built 1962
NE 50TH ST over I-5
Built 1962
I-5 S RAMP TO 45TH over 50TH RAMP TO I-5 S
Built 1961
Bridge Details
- Structure #
- 0006286C0000000
- Year Built
- 1961
- Length
- 411.2 m (1349.1 ft)
- Max Span
- 29 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 3
- Daily Traffic
- 36,725
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $16,660,000
- Total Project Cost
- $33,320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.