OLIVE WAY over I-5

1.7 N JCT I-90 · County 033, Washington · Built 1962 · 3 Lanes · 10,759 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

47.616247, -122.328933

This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 64 years old.

Nearby Bridges

Bridge Details

Structure #
0006635A0000000
Year Built
1962
Length
89.3 m (293 ft)
Max Span
40.5 m
Width
17.6 m (57.7 ft)
Lanes
3
Daily Traffic
10,759
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,157,000
Total Project Cost
$4,314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.