I-90 over COLUMBIA RIVER VANTAGE
26.4 E JCT I-82 · County 037, Washington · Built 1962 · 4 Lanes · 9,077 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
46.943956, -119.964472
This bridge is in worse condition than 70% of bridges in County 037. The average bridge in Washington is 0 years old; this one is 64 years old.
Nearby Bridges
I-90 over SR 26
Built 1961
HUNTZINGER RD over I-90
Built 1967
HUNTZINGER ROAD over WANAPUM RESERVOIR
Built 1962
I-90 over SILICA RD
Built 1981
I-90 over SILICA RD
Built 1982
Vantage Rd over FRENCHMAN SPRINGS
Built 1931
HILL TOP RD over FRENCHMAN SPRINGS
Built 1931
Vantage Rd over FRENCHMAN SPRINGS
Built 1931
O RD SW over WEST CANAL
Built 1958
GEORGE SOUTH ROAD over WEST CANAL BLK 78
Built 1993
Bridge Details
- Structure #
- 0006533A0000000
- Year Built
- 1962
- Length
- 763.2 m (2503.9 ft)
- Max Span
- 158.5 m
- Width
- 19.1 m (62.7 ft)
- Lanes
- 4
- Daily Traffic
- 9,077
- Material
- Steel Continuous
- Design
- Arch - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $44,008,000
- Total Project Cost
- $88,016,000