I-90 over COLUMBIA RIVER VANTAGE

26.4 E JCT I-82 · County 037, Washington · Built 1962 · 4 Lanes · 9,077 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0006533A0000000
Year Built
1962
Length
763.2 m (2503.9 ft)
Max Span
158.5 m
Width
19.1 m (62.7 ft)
Lanes
4
Daily Traffic
9,077
Material
Steel Continuous
Design
Arch - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$44,008,000
Total Project Cost
$88,016,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.