SR 160 over PUGET SOUND @ PT VASHON
N END VASHON ISLAND · County 033, Washington · Built 1957 · 3 Lanes · 7,310 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
47.508583, -122.464194
This bridge is in worse condition than 83.7% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 69 years old.
Nearby Bridges
SR 160 over PUGET SOUND
Built 1993
SR 160 over PUGET SOUND @ PT VASHON
Built 1997
SR 160 over PUGET SOUND @ SOUTHWORTH
Built 2003
SR 160 over PUGET SOUND @ SOUTHWORTH
Built 1957
SR 160 over PUGET SOUND @ FAUNTLEROY
Built 1984
SR 160 over PUGET SOUND @ FAUNTLEROY
Built 1957
SOUTHWORTH DRIVE over CURLEY CREEK
Built 2011
24TH AVE SW over LONGFELLOW CREEK
Built 1988
LONG LAKE ROAD SE over CURLEY CREEK
Built 1993
SW ADMIRAL WAY over SCHMITZ BLVD RAVINE
Built 1935
Bridge Details
- Structure #
- 0005713A0000000
- Year Built
- 1957
- Reconstructed
- 1990
- Length
- 226.8 m (744.1 ft)
- Max Span
- 5.8 m
- Width
- 15.8 m (51.8 ft)
- Lanes
- 3
- Daily Traffic
- 7,310
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,775,000
- Total Project Cost
- $15,550,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.