SR 160 over PUGET SOUND @ FAUNTLEROY
3.0 W SR 509 · County 033, Washington · Built 1957 · 2 Lanes · 9,721 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
47.523222, -122.393806
This bridge is in worse condition than 83.7% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 69 years old.
Nearby Bridges
SR 160 over PUGET SOUND @ FAUNTLEROY
Built 1984
24TH AVE SW over LONGFELLOW CREEK
Built 1988
SR 509 over N-N RAMP
Built 1968
S-S RAMP over 1ST AVE S
Built 1968
CLOVERDALE ST over SR 509
Built 1968
SR 99 over DUWAMISH RIVER
Built 1956
SR 99 over DUWAMISH RIVER
Built 1996
SW NEVADA ST over LONGFELLOW CREEK
Built 1988
SW MICHIGAN ST over WETLAND MIT. CHANNEL
Built 1996
N-E RAMP over OCCIDENTAL AVE S
Built 1998
Bridge Details
- Structure #
- 0005714A0000000
- Year Built
- 1957
- Reconstructed
- 2002
- Length
- 170.1 m (558.1 ft)
- Max Span
- 4.9 m
- Width
- 20.4 m (66.9 ft)
- Lanes
- 2
- Daily Traffic
- 9,721
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,301,000
- Total Project Cost
- $10,602,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.