SR 165 over GULCH NO 2

12.0 N RAINIER PARK · County 053, Washington · Built 1957 · 2 Lanes · 270 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0005632B0000000
Year Built
1957
Reconstructed
1969
Length
32 m (105 ft)
Max Span
5 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
270
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$698,000
Total Project Cost
$1,396,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.