SR 165 over CARBON RIVER

11.5 N RAINIER PARK · County 053, Washington · Built 1921 · 2 Lanes · 270 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
3
Serious
Substructure
5
Fair

Bridge Details

Structure #
0002950A0000000
Year Built
1921
Reconstructed
1945
Length
150.6 m (494.1 ft)
Max Span
73.2 m
Width
5.8 m (19 ft)
Lanes
2
Daily Traffic
270
Material
Steel Continuous
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,581,000
Total Project Cost
$5,162,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.