I-5 over SR 539
1.4 N JCT SR 542 · County 073, Washington · Built 1958 · 2 Lanes · 26,088 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
48.78285, -122.486175
This bridge is in worse condition than 47.6% of bridges in County 073. The average bridge in Washington is 0 years old; this one is 68 years old.
Nearby Bridges
I-5 OFF RAMP over SR 539 CREEK
Built 1988
I-5 over SR 539 MERIDIAN ST
Built 1958
BIRCHWOOD AVE. over BUG LAKE OVERFLOW
Built 1987
SQUALLICUM WAY over SQUALLICUM CREEK
Built 1970
SQUALICUM PKWY over SQUALICUM CR
Built 2020
I-5 over NORTHWEST AVE
Built 1958
I-5 over NORTHWEST AVE
Built 1958
I-5 over ORCHARD DR/SQUALICUM CR
Built 1958
NORTHWEST AVENUE over SQUALLICUM WY CRK CMSTP&
Built 1971
I-5 over ORCHARD DR/SQUALICUM CR
Built 1958
Bridge Details
- Structure #
- 0005620A0000000
- Year Built
- 1958
- Length
- 52 m (170.6 ft)
- Max Span
- 21.9 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 26,088
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,377,000
- Total Project Cost
- $2,754,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.