I-5 OFF RAMP over SR 539 CREEK

1.4 N JCT SR 542 · County 073, Washington · Built 1988 · 1 Lanes · 4,546 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000AB0000000
Year Built
1988
Length
158.5 m (520 ft)
Max Span
39.3 m
Width
8.9 m (29.2 ft)
Lanes
1
Daily Traffic
4,546
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,952,000
Total Project Cost
$7,904,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.