I-5 over PORTAGE CREEK

1.9 N JCT SR 531 · County 061, Washington · Built 1957 · 3 Lanes · 47,995 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

48.179431, -122.195108

This bridge is in worse condition than 50.6% of bridges in County 061. The average bridge in Washington is 0 years old; this one is 69 years old.

Nearby Bridges

Bridge Details

Structure #
0005440A0000000
Year Built
1957
Reconstructed
1969
Length
36.9 m (121.1 ft)
Max Span
9.1 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
47,995
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,638,000
Total Project Cost
$3,276,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.