US 12 over COWLITZ RIVER

7.8 E JCT SR 131 · County 041, Washington · Built 1948 · 2 Lanes · 2,712 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0003348A0000000
Year Built
1948
Length
168.9 m (554.1 ft)
Max Span
73.2 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,712
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,263,000
Total Project Cost
$10,526,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.