BAKER ROAD over SMITH CREEK

3.0 SW PACKWOOD · County 041, Washington · Built 1936 · 2 Lanes · 23 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
084331000000000
Year Built
1936
Length
34 m (111.5 ft)
Max Span
14.4 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
23
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$688,000
Total Project Cost
$1,377,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.