SR 99 over N 63RD ST
9.8 N JCT SR 509 · County 033, Washington · Built 1932 · 6 Lanes · 33,359 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.674239, -122.347253
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 94 years old.
Nearby Bridges
PHINNEY AVE over N 57TH ST
Built 1900
SR 99 over N 50TH ST
Built 1933
SR 99 over N 46TH ST
Built 1933
I-5 over RAVENNA BLVD
Built 1961
I-5 over RAVENNA BLVD
Built 1961
I-5 REV EXP LANES over RAVENNA BLVD
Built 1961
I-5 SB over FALLOUT SHELTER
Built 1963
N 85TH TO SB I-5 over I-5 SB RAMP TO NE 80TH
Built 1964
NE 70TH-NE 71ST ST over I-5
Built 1962
NE 80TH ST over I-5 I-5 EXP LNS RAMPS
Built 1964
Bridge Details
- Structure #
- 0001673A0000000
- Year Built
- 1932
- Length
- 22.3 m (73.2 ft)
- Max Span
- 15.5 m
- Width
- 24.1 m (79.1 ft)
- Lanes
- 6
- Daily Traffic
- 33,359
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,075,000
- Total Project Cost
- $2,150,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.