SR 174 over COLUMBIA BASIN CANAL
1.3 E DOUGLAS CO · County 025, Washington · Built 1949 · 2 Lanes · 1,493 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.946147, -119.004308
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 77 years old.
Bridge Details
- Structure #
- 000000LP0000000
- Year Built
- 1949
- Length
- 69.2 m (227 ft)
- Max Span
- 24.1 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,493
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,048,000
- Total Project Cost
- $4,097,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.