SR 155 over COLUMBIA RIVER
0.2 N GRANT CO · County 017, Washington · Built 1935 · 2 Lanes · 4,923 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.965386, -118.983617
This bridge is in worse condition than 40% of bridges in County 017. The average bridge in Washington is 0 years old; this one is 91 years old.
Bridge Details
- Structure #
- 000000JJ0000000
- Year Built
- 1935
- Length
- 331.9 m (1088.9 ft)
- Max Span
- 167.6 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 4,923
- Material
- Steel Continuous
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,863,000
- Total Project Cost
- $21,726,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.