I-90 over LAKE WASHINGTON

1.9 E JCT I-5 · County 033, Washington · Built 1940 · 4 Lanes · 68,544 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
000000KN0000000
Year Built
1940
Reconstructed
1992
Length
1999.8 m (6561 ft)
Max Span
1999.8 m
Width
18.3 m (60 ft)
Lanes
4
Daily Traffic
68,544
Material
Concrete
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$84,145,000
Total Project Cost
$168,290,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.