I-90 over RAINIER AVE
0.6 E JCT I-5 · County 033, Washington · Built 1988 · 5 Lanes · 56,847 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
47.589961, -122.307028
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 38 years old.
Nearby Bridges
I-90 over RAINIER AVE S
Built 1992
W-N I-90 RAMP over PEDESTRIAN-BIKE PATH
Built 1988
I-90 WESTBOUND over Sound Transit Railroad
Built 1988
12TH AVE S over I-90
Built 1968
I-90 EB over I-90 WB
Built 1988
12 AVE S over DEARBORN ST
Built 1917
DEARBORN-N RAMP over I-5 NBCD
Built 1965
I-90 W-S RAMP over I-5
Built 1965
BEACON-HOLGATE over I-5
Built 1966
I-5 NBCD RAMP over TERRAIN
Built 1965
Bridge Details
- Structure #
- 0013190A0000000
- Year Built
- 1988
- Length
- 93.6 m (307.1 ft)
- Max Span
- 36.9 m
- Width
- 25.3 m (83 ft)
- Lanes
- 5
- Daily Traffic
- 56,847
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,979,000
- Total Project Cost
- $11,958,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.