SR 509 over JOES CREEK

2.1 N PIERCE CO · County 033, Washington · Built 1929 · 2 Lanes · 3,913 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

47.326772, -122.376917

This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 97 years old.

Nearby Bridges

Bridge Details

Structure #
000000HY0000000
Year Built
1929
Reconstructed
1996
Length
80.5 m (264.1 ft)
Max Span
21.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
3,913
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,132,000
Total Project Cost
$4,264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.